Completed Projects

South Quay Plaza

Description:
South Quay Plaza offers a diverse collection of premium homes, enjoying sky-high living across 68 floors, with panoramic views across Central London.

Scope of works:
Our scope of works included drylining to partitions, party walls, wall linings and M/F ceilings within 609 dwellings fully in accordance with Siniat Specification.

Location: Canary Wharf

Date of completion: 2023
Contract value: £11m

Main contractor: Berkley Homes

 

The Stage

Description:
The Stage is a 540,000 sq ft mixed-use luxury development located where Shoreditch meets the City of London. Centered around the historic remains of Shakespeare’s Curtain Theatre, the 37-storey project combines high-end residential apartments, office space, and retail.

Scope of works:
Our scope of works included drylining to partitions, party walls, wall linings and M/F ceilings within 410 dwellings fully in accordance with Siniat Specification

Location: Shoreditch
Date of completion: 2023
Contract value: £8m

Main contractor: CJ O’Shea

 

Portal West

Description:
Portal West is a landmark residential-led mixed-use development in North Acton. The development comprises 578 modern apartments across four striking high-rise buildings, ranging from 9 to 42 storeys, alongside commercial space, landscaped areas, roof terraces and resident amenities.
Scope of works:
Our scope of works included drylining to partitions, party walls, wall linings and M/F ceilings within 700 dwellings fully in accordance with Siniat Specification

Location: Acton, West London
Date of completion: 2023
Contract value: £8.5m

Main contractor: CJ O’Shea

Good Luck Hope

Description:

Goodluck Hope is set on the banks of the River Thames, offering panoramic views across The O2, Canary Wharf and beyond. This historic dockyard has been transformed into a distinctive new residential quarter, combining its industrial heritage with contemporary design.

With more than 650 residences across its unique island setting, Goodluck Hope offers a diverse selection of luxury apartments, creating an exceptional riverside destination in East London.

Scope of works:
Our scope of works included drylining to partitions, party walls, wall linings and M/F ceilings within 700 dwellings fully in accordance with Siniat Specification.

Location: East London
Date of completion: 2023
Contract value: £8m

Main contractor: Ballymore

 

Greenwich High Road

Description:
The Greenwich High Road development provides 235 new luxury homes within 3 residential blocks
and a hotel.
Scope of works:
The project involved the installation of infill Metsec steel framing systems and sheathing board to the external walls. Our interior scope of work included drylining party walls, partitions and wall linings, M/F ceiling systems and demountable suspended ceilings to corridors.

Location: Greenwich, London
Date of completion: 2011
Contract value: £2.9m

Main contractor: Galliard Homes

Clapham Park

Description:
Part of the Clapham Park regeneration scheme the development provides 114 mixed sized apartments.
Scope of works:
The project involved the installation of infill Metsec steel framing system and insulated render system to the external walls to create a distinctive exterior by using high quality materials. Our interior scope of works included drylining party walls, partitions and wall linings, M/F ceiling systems.

Location: Clapham, London
Date of completion: 2012
Contract value: £1.4m

Main contractor: Wates Living Space

Merchant Square

Description:
Merchant Square is part of the regeneration of Paddington’s waterside, forming a new prestigious London landmark.
Scope of works:
Our scope of works consisted of the installation of drylining to party walls, partitions, wall lining, M/F ceiling systems and floor screed to 185 luxury apartments and tiled suspended ceilings to corridors and communal areas.

Location: Paddington, London
Date of completion: 2010
Contract value: £2.5m

Main contractor: Carillion Building

Velocity Tower

Description:
The Velocity Tower provides 113 new homes with commercial units on ground floor. The project is part of an affordable housing scheme transforming the site of an old warehouse on Stratford High Street.
Scope of works:
Our scope of works included the installation of Metsec steel framing system and sheathing board to the external walls, interior drylining to partitions, party walls, wall linings and M/F ceilings and acoustic tiled ceilings to corridors.

Location: Stratford, London
Date of completion: 2011
Contract value: £1.2m

Main contractor: Wates Living Space

Abford House

Description:
Located at the forecourt of Victoria Station Abford House comprises retail units at street level and high specification offices over nine floors.
Scope of works:
Our scope of works consisted of the installation of tiled suspended ceilings, drylining to core partitions and wall linings, GRG column casings, M/F ceilings and external rendered soffit system.

Location: Victoria, London
Date of completion: 2009
Contract value: £1m

Main contractor: Carillion Building

Roundwood Youth Centre

Description:
Roundwood Centre includes an IT suite, cafe, recording studio, dance theatre and performance area built for the young people North West London.
Scope of works:
Our scope of works included forming internal partitions, wall linings and suspended ceilings to emphasize the brilliant translucent external wall design

Location: Willesden, London
Date of completion: 2012
Contract value: £250,000

Main contractor: Morgan Sindall

Leading residential and commercial specialists in Dry Lining, Metsec Framing, Plastering, Rendering, Screeding and Suspended Ceilings in London and the South East

Home | Dry Lining | Metsec Framing | Plastering | Rendering | Screeding | Suspended Ceilings | Contact Us | Careers


Privacy Policy. Copyright © 2021 S&R London Ltd. All rights reserved.
S & R London Limited, 17 Martinfield, Welwyn Garden City, Herts, AL7 1HG Telephone: 01707 373498